Needs analysis for construction projects
Contents |
[edit] Introduction
A needs analysis is a systematic information gathering process carried out to determine whether or not something (such as a project) is justified. It may also be referred to as a needs assessment, situational analysis or organisational diagnosis.
The difference between a needs analysis and a feasibility study is minor but crucial. A needs analysis is primarily based on the needs or gaps in an organisation, while a feasibility study discounts the need and weighs both the strengths and weaknesses of an organisation or project to establish whether the project is viable. For building projects, a needs analysis occurs before feasibility studies take place.
A needs analysis can be formal or informal. The format and scope are often dependent on the scale of the project. If analysis justifies a specific course of action, it may be necessary to revisit the report if conditions change significantly. At this point a new assessment may be required to validate the continuation of the course of action. It may also dictate a change to the original plan of action and initiate a new needs analysis.
The analysis will establish what resources are available and determine how they can best be used. This information can help to support current and future activities and serve as the basis for assessing progress as an organisation moves towards its goal.
[edit] Components of a needs analysis
A needs analysis is typically made up of three phases:
- Gap analysis. This looks at the current state of an organisation and assesses where it hopes to be at a certain point in time.
- Priority setting. This organises goals into a practical list of key actions and determines the order of the goals based on realities and limitations.
- Plan completion. An integrated plan based on the information gathered that will result in a report setting out whether or not the business case for a project is justified.
[edit] Needs assessments and facilities management
Within facilities management departments, it can be useful to conduct needs assessments in conjunction with service management strategies - particularly in terms of soft facilities management. By conducting a facilities needs assessment, managers can feel more comfortable making decisions such as whether to outsource services that are not part of the organisation's core activities.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.